The Little Conestoga Watershed Alliance
"BEFORE AND AFTER" Photos of Completed Projects
Bachman Run Restoration Project

Bachman Run, Photo 1, BEFORE Restoration: Looking west downstream
at eroded stream bend (left bank) on Bachman Run on the Ellis property (May 2004).

Bachman Run, Photo 1, AFTER Restoration: After stream restoration
(August 4, 2005).

Bachman Run, Photo 2 - BEFORE: View of Bachman Run from the concrete
crossing that acted as a dam obstruction between the Voulopos and
Wetherburn North properties. The obstruction created a ponded, stagnant pool
on the upstream section of Bachman Run (May 2004).

Bachman Run, Photo 2 - AFTER: After stream restoration (August 4, 2005).
Millers Run Restoration Project

Photo 1, Millers Run - BEFORE: Looking east downstream at Millers Run in the
former Habecker property pasture area during field data collection & surveying
(August, 2002).

Photo 1, Millers Run - AFTER: After stream restoration, buffer planting
and Hurricane Ivan (September 28, 2004).

Photo 2, Millers Run - BEFORE: View of eroded Millers Run Channel during
cross section surveying of impacted reach in the former Habecker pasture
(August, 2002).

Photo 2, Millers Run - AFTER: After stream restoration, buffer planting and
Hurricane Ivan (September 28, 2004).
Maple Grove Community Center Restoration

Maple Grove Community Center streambank restoration, showing
plantings along water and engineering work performed to reduce erosion.
LASA/Manor Tributary Restoration Project

Photo 1: LASA/Manor Tributary BEFORE Restoration (August 2000)

Photo 1: Above photo is the LASA/Manor Tributary AFTER
Restoration (March 2002)

Photo 2: LASA/Manor Tributary BEFORE Restoration (August 2000)

Photo 2: Above photo is the LASA/Manor Tributary AFTER
Restoration (March 2002)