The Little Conestoga Watershed Alliance

"BEFORE AND AFTER" Photos of Completed Projects

 

 

Bachman Run Restoration Project

 

Bachman Run, Photo 1, BEFORE Restoration: Looking west downstream

at eroded stream bend (left bank) on Bachman Run on the Ellis property (May 2004).

 

Bachman Run, Photo 1, AFTER Restoration: After stream restoration

(August 4, 2005).

 

Bachman Run, Photo 2 - BEFORE: View of Bachman Run from the concrete

crossing that acted as a dam obstruction between the Voulopos and

Wetherburn North properties.  The obstruction created a ponded, stagnant pool

on the upstream section of Bachman Run (May 2004).

 

Bachman Run, Photo 2 -  AFTER: After stream restoration (August 4, 2005).

 

 

 

Millers Run Restoration Project

Photo 1, Millers Run - BEFORE: Looking east downstream at Millers Run in the

former Habecker property pasture area during field data collection & surveying

(August, 2002). 

 

Photo 1, Millers Run - AFTER: After stream restoration, buffer planting

and Hurricane Ivan (September 28, 2004).

 

 

Photo 2, Millers Run - BEFORE: View of eroded Millers Run Channel during

cross section surveying of impacted reach in the former Habecker pasture

(August, 2002).   

 

Photo 2, Millers Run - AFTER:  After stream restoration, buffer planting and

Hurricane Ivan  (September 28, 2004).

 

Maple Grove Community Center Restoration

Maple Grove Community Center streambank restoration, showing

plantings along water and engineering work performed to reduce erosion.

 

 

LASA/Manor Tributary Restoration Project

 

Photo 1: LASA/Manor Tributary BEFORE Restoration (August 2000)

 

 

Photo 1: Above photo is the LASA/Manor Tributary AFTER

Restoration (March 2002)

 

 

Photo 2: LASA/Manor Tributary BEFORE Restoration (August 2000)

 

 

Photo 2: Above photo is the LASA/Manor Tributary AFTER

Restoration (March 2002)

 

BACK TO MAIN PAGE

Last Updated:  12/19/2006 by

Todd Trout, Lancaster Country Day School Science Department

e-mail:  troutt@e-lcds.org